welcome

beijing office : 86-10-8710-3488

news
location: home > news > industry news > pttep, cooec and moge jointly celebrate zawtika 1b project

pttep, cooec and moge jointly celebrate zawtika 1b project-ag尊龙凯时

issue date:2016/01/08 industry news performance page views:2025


mr. pairoj rangponsumrit, acting president and chief executive officer, executive vice president, production asset group, ptt exploration and production public company limited (pttep), u han htoon, director of material planning from myanma oil and gas enterprise (moge), and mr. zhou xuezhong, chief executive officer, offshore oil engineering company limited (cooec), together presided over the load out and sail away ceremony for the wp4 wellhead platform which will sails to its destination at the zawtika project in myanmar in november 2015. the ceremony was held at tanggu fabrication yard, the people’s republic of china.

the wp4 platform is one out of four platforms that have been developed under zawtika phase 1b  project, which achieved 3,000,000 man-hours without a lost time incident (lti).

photo shows mr. pairoj (center), mr. zhou (left), and u han htoon (right) jointly presided over the ceremony.

网站地图