central asia-ag尊龙凯时
issue date:2012/12/15 industry news performance page views:1048
the central asia-china gas pipeline starts at turkmen-uzbek border city gedaim and runs through central uzbekistan and southern kazakhstan before reaching horgos in china’s xinjiang uygur autonomous region. currently the gas pipeline has three lines in parallel, each running for 1,830 kilometers. construction of line a/b commenced in july 2008. with pipe diameter of 1,067mm, line a became operational in december 2009, and line b became operational in october, 2010. a delivery capacity of 30 billion cubic meters per annum was reached by the end of 2011.
previous: kazakhstan-china oil pipeline